The crew is on site Monday. The trucks are out every day. The schedule is full for the next month. Then you open the bank account or the P&L and the profit is thin, or one bad job wipes out five good ones.
That is the tension. Staying busy keeps the crew paid and the customers served. It also hides which jobs earn and which jobs cost you, and a full schedule can sit on top of work that loses money.
The books are usually the reason you cannot see it. They record what came in and went out. They do not say which job each dollar belongs to. So quotes get built without the true cost of delivery, and the year-end number tells you something happened but not which jobs caused it.
Where the money goes: five leaks
Read the table across. Each row is a leak, what it looks like, how big the example on this page is, what to check, and who fixes it. The sizes are illustrations with the arithmetic shown. Put your own numbers in.
| Leak | What it looks like | Illustration (basis shown) | Check this week | Who fixes it |
|---|---|---|---|---|
| 1. Quotes built on wages only | Price set from labor estimates that leave out payroll taxes, workers' comp, benefits, vehicle and fuel cost, equipment wear, supervision time and rework | No single figure. The gap is the cost left out of each quote. | Take your last 5 jobs. Add every cost you can trace to each job. Divide by what you billed. Compare with the margin you quoted. | Specialty bookkeeper to record it by job; controller to turn it into a pricing model |
| 2. Unbilled extras | The customer asks for a small add-on mid-job. You do it and do not write it up or invoice it. | 3 extras per job x 200 jobs x $400 each = $240,000 of work a year with no invoice | Pull last quarter's jobs. Put the quoted scope next to the scope delivered. The gap is the leak. | Owner and crew first (a change-order habit); bookkeeper to link each change order to its job |
| 3. Overhead missing from bids | Rent, the dispatcher, the office, truck insurance, software and marketing are paid out of job margin, but the bids never carried them | Job priced at a 25% margin, overhead at 18% of revenue: 25% - 18% = 7% left. On $1.2M of revenue, 7% is $84,000. | Add up a year of everything that is not direct job cost. Divide by billable labor hours. That is the overhead each hour must carry. | Controller |
| 4. Paid hours that are not productive | Drive time, waiting on materials, rework and calls to dispatch are paid for but cannot be billed | A 40-hour job: 4 drive + 3 waiting + 2 rework + 1 call = 10 hours. 30 of 40 hours were productive, 75%. | Time-track one crew for one week. Tag each block: productive, drive, wait, rework, admin, other. | Owner and dispatcher to track; controller to load the ratio into quotes |
| 5. Customers who slow the cash | Low-margin work that is also slow to pay, because the crew needs to stay busy | A 12% margin job that takes 60 days to collect, next to a 28% margin job on terms you set. The first ties up cash for two months and still earns less on each dollar billed. | Sort last year's jobs by margin. Look at the bottom quarter. Who are those customers, and how long did each take to pay? | Fractional CFO for which customers to keep; bookkeeper for the collection report |
Two numbers to keep apart. The margin on a job is what is left after its costs. The days to collect is when the cash actually arrives. A job can look fine on the first and still starve the business on the second. Track both.
What the books need before any of this is visible
Job costing is not a report you switch on in QuickBooks. It is a setup, and the data has to be recorded the right way from the start. Each job needs:
- Crew hours tagged to that job ("5 hours on the bathroom remodel job on Tuesday"), not a weekly total per person.
- Materials charged to the job when you buy them, not left in a general materials account to untangle later.
- Equipment charged at an hourly internal rate, so the bucket truck's maintenance, insurance and replacement are covered by the jobs that use it.
- Overhead added at a set rate per billable labor hour.
- Every invoice, change orders included, tied to the job it came from.
- A profit number for each closed job, produced monthly.
This does not happen by default. It takes a one-time setup, steady habits from the crew, and someone who reads the result each month.
Who does what
Generalist bookkeepers usually categorize transactions correctly for tax and produce a clean year-end P&L. Setting up job-level tracking is a different skill. Specialists in construction, trades or project accounting do that setup. Get quotes from both kinds and compare what each delivers.
| Role | What it does for this problem |
|---|---|
| Specialty bookkeeper | Sets up job costing in your accounting system, trains the crew on time entry, assigns costs to jobs as they happen, produces the monthly job-cost report |
| Controller | Reads the job-cost data: which job types, customers and crew setups earn. Builds the pricing model future bids follow. |
| Fractional CFO | Sets pricing at the whole-business level, decides which customers to keep and which to move on from, models a price increase |
This page gives no fee figures. Ask each provider for a quote.
The order matters. The bookkeeper comes first because the other two need the data the bookkeeper produces. If you are comparing roles first, see bookkeeper vs controller vs CFO and controller vs fractional CFO.
When revenue is up and your own pay is not
Everything above is about the business. There is a second version of this problem: sales grew, and what you personally take home stayed about the same. This page does not decide why. Take these four questions to your CPA:
- "Given how my business is taxed, how much of what it earned last year did I pay tax on, and how much of that did I actually take home?"
- "Am I paying tax now on profit I have not yet collected in cash, and how much should I set aside each quarter?"
- "If I pay for this help, what does it cost me after tax, and is any of it not deductible?"
- "Am I paying myself the right way for my business, and what would change if I paid myself differently?"
For a number to bring to those questions, see the owner pay calculator (how much can I pay myself).
When the opposite choice is right
Busy low-margin work is sometimes the correct call. A slow season where the crew would otherwise sit idle, a first job with a customer you expect to bring bigger work, or a job that covers fixed costs you owe either way can all be worth taking at a thin margin. The problem is not the thin job. It is taking it without knowing it is thin.
Flat take-home can also be a deliberate choice: profit kept in the business for hiring, equipment or a cash cushion. If that is what is happening, the fix may be nothing at all.
The habit to keep
Before you quote the next job, ask: what did the last similar job actually cost, and what was left after the costs I forgot to count?
The check to start with
If you cannot answer that question for your last five jobs, you cannot yet tell which busyness is paying off. The job costing diagnostic at GetAFractional maps your current accounting setup against what job-level visibility needs, and gives you a prioritized gap list, in about three minutes.
Take the job costing diagnostic
If you are not sure which finance role you need first, the role clarity diagnostic ( /diagnostic/role-clarity/ ) sorts that out.
Related tools: Job costing diagnostic (/diagnostic/job-costing/), Which finance role you need (/diagnostic/role-clarity/), Owner pay calculator (/learn/how-much-can-i-pay-myself/)
Related articles: Bookkeeper vs controller vs CFO (/learn/bookkeeper-vs-controller-vs-cfo/), Controller vs fractional CFO (/learn/controller-vs-cfo/), Bookkeeper vs CPA (/learn/bookkeeper-vs-cpa/), Growing too fast and out of cash (/learn/growing-too-fast-cash-crunch/), Gross margin analysis (/learn/gross-margin-analysis-small-business/), Profitable on paper but my bank account is empty (/learn/profitable-on-paper-bank-account-empty/)